Evaporation plant Lenzing AG
Lenzing, Upper Austria
2021-2024
Industrial construction




- Industrial building to accommodate two evaporators
- Installation of a basement under an existing railway track system in operation during the construction work using a top-down construction method
- Superstructure over the existing track system during ongoing track operation constructed in reinforced concrete (floor plan approx. 33m x 19m), designed to accommodate two evaporator steel structures
- Steel structure to accommodate an evaporator (approx. 150t)
- Total structural analysis and design
- Client Lenzing AG