Evaporation plant Lenzing AG

 

Lenzing, Upper Austria
2021-2024
Industrial construction

 

 

  • Industrial building to accommodate two evaporators
  • Installation of a basement under an existing railway track system in operation during the construction work using a top-down construction method
  • Superstructure over the existing track system during ongoing track operation constructed in reinforced concrete (floor plan approx. 33m x 19m), designed to accommodate two evaporator steel structures
  • Steel structure to accommodate an evaporator (approx. 150t)
  • Total structural analysis and design
  • Client Lenzing AG