Ropecon wood chips conveyor system and boiler building Lenzing AG

 

Lenzing, Upper Austria
2016 – 2022
Industrial construction

 

  • Demolition planning of an existing pulp boiler building, floor plan approx. 10m x 21m and 28m high, part of an existing and remaining building complex
  • Total structural design of a building to house two pulp boilers, floor plan approx. 10m x 21m and 34m high, reinforced concrete frame construction with pile foundation, prepared to support a steel structure for a Ropecon conveyor system (Doppelmayr).
  • Structural design of the entire substructure for the conveyor system's supports. Steel construction for wood chip feeding including foundation and cable anchoring. Reinforced concrete foundation for an intermediate column with a height of 35m. Steel construction for the wood chip discharge system on the boiler building (upper edge at a height of 45 m). Rope anchoring outside the factory premises in reinforced concrete construction with pile foundation.
  • Client Lenzing AG