© Neuwirth-Kienmandl ZT GmbH  |  Imprint Data protection |   Design by Glenpix

Boiler project

 

Lenzing, Upper Austria

2005-2009
Industrial construction

 

 

  • Two boiler buildings, one recovery building and one slipform stair tower with adjacent electric switch room building
  • Structural analysis and design of the land reclamation measures at the river Ager to crate the building area
  • Structural analysis and design of all concrete parts (foundation, slip form stair tower, electric switch room,...)
  • Structural analysis and design of the recovery building (steel)
  • Controlling of the structural analysis of the two boiler buildings
EN